A.C. Constructions QLD logo
Light and airy Townsville Queenslander bathroom with louvre windows

Townsville Bathroom Report 2026

What 80+ years of weather records, Queensland building-defect data and Census figures tell us about bathrooms in Townsville. Compiled by Townsville Bathroom Renovation Specialists. Last updated November 2026.

When the rain falls in Townsville

  • January to March alone delivers about 68% of Townsville's yearly rain.

    [BoM]
  • February is the wettest month, averaging 312.9 mm.

    [BoM]
  • September is the driest month, averaging 9.9 mm and 1.2 rain days.

    [BoM]
  • Townsville averages about 65 rain days a year, roughly one day in six.

    [BoM]
  • Cairns averages about 120 rain days a year, nearly twice as many as Townsville.

    [BoM]
  • Severe tropical cyclones affect Townsville on average about once every twenty years.

    [BoM]

Townsville's dry season is long and reliable, so it's the ideal time for the wet-work stages of a renovation: waterproofing, screeds and tiling. Book early for May to October, because it's also when most people want their bathroom done. Wet-season renovations still work; they just need extra curing time and some flexibility on dates.

Humidity and mould

  • Townsville's average 9am humidity is 70% or higher from January to March.

    [BoM]
  • Average 9am humidity is 60% or higher in all 12 months, and 66% across the year.

    [BoM]
  • The National Asthma Council says humidity of 70% is ideal for mould growth and recommends keeping indoor humidity below 60%.

    [National Asthma Council]

In Townsville the biggest danger is the wet season, when the air rarely dries out. A correctly sized exhaust fan ducted outside, sealed grout and good waterproofing stop that seasonal moisture turning into mould.

Building defects and what they cost

  • Waterproofing defects consistently rank among the top ten most common defective work complaints to the QBCC.

    [QBCC]
  • Under the Queensland Home Warranty Scheme, residential bathroom claims finalised in 2024–25 averaged almost $25,000 in rectification costs.

    [QBCC]
  • In Townsville, the QBCC says the most common structural defects relate to roof cladding and drainage.

    [QBCC]

Roof and drainage problems often show up in bathrooms first, as stains, leaks and mould. When we renovate, we check the ceiling space and drainage around the bathroom, not just the room itself.

Townsville homes at a glance

For landlords, mould or a slow leak in a tired bathroom is now a compliance issue as well as a maintenance one. For older homeowners, a walk-in shower, grab rails and slip-resistant tiles make staying at home safer for longer.

Methodology

This report combines public data. Climate figures are long-term monthly averages for Townsville Aero (station 032040) from the Bureau of Meteorology. Rainfall covers 1940–2026 and humidity covers 1940–2010. Cairns comparisons use Cairns Aero (station 031011). Seasonal shares, "rain days May to November" and month counts are our own calculations from those monthly averages. Defect and claim figures come from the Queensland Building and Construction Commission. Housing figures come from the ABS 2021 Census (Townsville Local Government Area). Rental rules come from the Residential Tenancies Authority. Where we've calculated a figure ourselves, we say so. We'll update this report each year. From 2027 it will also include anonymised answers from the quick questions people complete when requesting a quote.

Sources

  1. Bureau of Meteorology, Climate statistics for Townsville Aero
  2. Bureau of Meteorology, Climate of Townsville
  3. Bureau of Meteorology, Climate statistics for Cairns Aero
  4. QBCC, Waterproofing done right: what you need to know in 2025
  5. QBCC, QBCC heatmaps the state to target defect hotspots
  6. ABS, 2021 Census QuickStats, Townsville LGA
  7. RTA Queensland, Minimum housing standards fact sheet
  8. Queensland Government, Rental legislation changes
  9. National Asthma Council Australia, Indoor humidity levels

Using this data

Journalists, bloggers and researchers are welcome to use these figures under a CC BY 4.0 licence. Please credit "Townsville Bathroom Report 2026" and link to this page. For media enquiries, contact Adam.

Bathroom renovation FAQs

When is the best time to renovate a bathroom in Townsville?

May to November. Townsville averages just 18 rain days across those seven months combined, while about 84% of its yearly rain falls between December and April.

Is mould a problem in Townsville bathrooms?

It can be, especially in the wet season. Townsville's average 9am humidity is 70% or higher from January to March, so ventilation, sealed grout and sound waterproofing matter.

How much does it cost to fix a failed bathroom in Queensland?

Under the Queensland Home Warranty Scheme, residential bathroom claims finalised in 2024–25 averaged almost $25,000 in rectification costs.

Do Queensland rentals have to be mould-free?

Yes. Since 1 September 2024, Queensland's minimum housing standards require all rental premises to be free of vermin, damp and mould, unless the tenant caused it.

Planning a Townsville bathroom? Get a free in-home quote.

Bathroom renovation cost guide for Townsville →
Call NowFree Quote